Crane-jib telemetry on a $14 billion rail program
The Victorian Major Rail Construction Project was a $14 billion level crossing removal initiative spanning 74 rail crossing sites across metropolitan Melbourne. The project required improved operational visibility, productivity insights, equipment tracking, and safety outcomes across multiple active construction sites.
Meshed delivered a LoRaWAN-enabled Smart Construction Kit as part of a Connected Site initiative led by McConnell Dowell and supported by Orange Business Services. The solution deployed GPS tracking on crane jibs to monitor lifting activity and generate accurate placement-time data in real time. Operational data was integrated into AVEVA PI and visualised through Power BI dashboards, enabling project teams to make faster, data-driven decisions.
- ✓Increased construction productivity and better crane utilisation analytics
- ✓Reduced equipment downtime and predictive maintenance insights
- ✓Enhanced project forecasting accuracy and stronger operational visibility across sites
- ✓Improved scheduling and resource allocation









